top of page
Search

The RSA Competition Win

The project has recently won a RSA design award for the ‘Branching Out’ brief. The ‘Branching Out’ brief was one of the nine competition...

Site Axo

In front of houses would be trees like aspen, birch – trees that are lightweight and I think really attractive, they wouldn’t block too...

Timber as an Aesthetic

Internally I think that a Living room should include warm colour tones and we should use timbers which have planed for a better quality...

Shallow Plans

A major issue with UK timber is that very few species have strength classifications. To achieve a strength classification it takes...

A Revised Timber Selection Process

Following further study into the strengths of timber the selection process has been revised to better assign timbers with their building...

9 Development Sites

Analysing the 9 sites to determine which site would be best suited for a model forest village.

Completed M62 Masterplan

9 Sites have been chosen using criteria such as: soil types, flood zones, rainfall and land use. Each site has been allocated a selection...

Initial Masterplan

Using soil types and land uses to select potential tree growing and development sites. A target area has been located due to available land.

UK Soil Types

Locating different soil types throughout the projects territory to help select the most appropriate sites for growing trees. Different...

The White Rose Forest

Analyzing the White Rose Forest to generate potential project ideas and concepts.

Ecology

Calculating the quantity of different animals that could exist in a more forested Northern Forest.

Blog: Blog2

©2019 by Re-foresting: A Strategy for Productive Villages. Proudly created with Wix.com

bottom of page